The Boring Company's free tunnels: what happened to the New Orleans, Baltimore and Dallas winners3 min

The Boring Company's free tunnels: what happened to the New Orleans, Baltimore and Dallas winners

Boring Co. ·

In March, The Boring Company picked three cities for a free one-mile Loop tunnel. One winner pulled out a day later. Here is where the New Orleans and Dallas projects stand.

In January 2026, The Boring Company tried something new: instead of selling tunnels to cities, it offered to give one away. Its "Tunnel Vision Challenge" invited anyone to pitch a tunnel, with a free one-mile Loop as the prize. Seven months after the winners were named, the results are a useful look at how hard it is to turn a free tunnel into a real one.

The contest in numbers

  • Entries: 487 submissions from around the world, according to Secret Dallas.
  • The prize: a tunnel up to one mile (1.6 km) long with a 12-foot (about 3.7 m) inner diameter, the standard size for a Loop.
  • The winners: on March 24, 2026, the company picked three instead of one: the NOLA Loop in New Orleans, the Ravens Loop in Baltimore and the University Hills Loop in Dallas.
  • The catch: each project first has to pass a due diligence phase paid for by The Boring Company, including talks with officials, geotechnical borings and a survey of utilities and other underground infrastructure. Only projects that pass go ahead. If all three pass, the company said it would build all three.

Baltimore: out after one day

The Ravens Loop was proposed by the Baltimore Ravens football team. On March 25, a day after being named a winner, the team said the idea was "only in the exploratory phase" and that after talks with public partners it would not continue "at this time". The mayor's office said it supported the decision. The Baltimore Sun's report also said The Boring Company had backed out; the Ravens' own statement did not say who ended the process.

New Orleans: a route along Poydras Street

Mayor Helena Moreno filed the New Orleans application on February 20. According to Hoodline, which cited the filing as reported by NOLA.com, the preferred route starts near City Hall and the Hyatt Regency on Loyola Avenue, runs under Poydras Street to Convention Center Boulevard and ends at Julia Street. The goal is to link hotels, the convention center and the riverfront, and to ease traffic during big events.

The filing projected about 75,000 to 125,000 riders a year, and a trip of around three minutes between the convention center and the Hyatt during large events. The big question is the ground: New Orleans sits largely below sea level, with a shallow water table and soft river sediments, far harder conditions than the dry soil under Las Vegas. Permits, safety reviews and public input are all still to come.

Dallas: a tunnel to a rail station

In Dallas, developer Hoque Global entered University Hills, a $1 billion, 270-acre mixed-use development near the University of North Texas at Dallas. The tunnel would connect the development to the UNT Dallas station of DART, the regional rail network. The plans include around 2,000 homes and 1.5 million square feet of commercial space. No timeline for the diligence phase or construction has been published.

The Tesla link

Loop systems run on Tesla cars: in Las Vegas, Tesla cars carry the passengers, and Tesla's self-driving software is being tested in the tunnels. Every new Loop is therefore a potential new fleet of Teslas, and a possible place for driverless operation. The contest also produced two side projects The Boring Company said it would explore: a utility tunnel in Hendersonville, Tennessee, and a tunnel for the Morgan's Wonderland campus in San Antonio, where a Prufrock machine is now waiting for final approval.

Why it matters

A free tunnel sounds like an easy yes, but the Baltimore exit shows that public partners, permits and local politics still decide what gets built. For The Boring Company, completed projects in very different ground, from New Orleans' wet soil to Texas clay, would be strong proof that its cheap-tunnel approach works outside Las Vegas.

What to watch next

Results from the geotechnical borings in New Orleans, any construction date for University Hills, and whether The Boring Company runs another round of the challenge.

Sources (4)
11 kW

A 22 kW charger won't charge your Tesla any faster

Most Tesla models charge at home at up to 11 kW AC.

Read why →
3 min

Nashville's Music City Loop reaches downtown, but a new report warns of sinkholes, flooding and pollution in the rock ahead

The Boring Company's tunnel under Nashville has reached the Music City Center. A hydrogeology report says the hardest limestone, with caves and contaminated sites nearby, is still to come.

3 min

Self-driving Teslas in the Vegas Loop: why the tunnels still have safety drivers

Driverless Teslas in The Boring Company's Las Vegas tunnels were first expected in 2023. Here is the timeline of promises and tests, and where things stand now.

3 min

The Boring Company's free tunnels: what happened to the New Orleans, Baltimore and Dallas winners

In March, The Boring Company picked three cities for a free one-mile Loop tunnel. One winner pulled out a day later. Here is where the New Orleans and Dallas projects stand.

2 min

Prufrock explained: how The Boring Company's tunnel machine works, and where Tesla comes in

Prufrock launches straight from the surface, lines the tunnel while it digs and moves to the next site on a trailer. How it differs from classic tunnel boring, the targets, and the Tesla links.

2 min

The Boring Company bets on the Gulf: Dubai Loop, an Abu Dhabi study and UAE money

The UAE led a $3 billion funding round, Dubai has signed for a pilot Loop and Abu Dhabi has started a study. What is agreed, what is only being explored, and how Teslas fit in.

2 min

A Boring Company tunnel for Morgan's Wonderland: Prufrock-5 arrives in San Antonio

A 900,000-pound tunnel boring machine is waiting at an inclusive theme park campus in San Antonio. What the project is, who pays, and what still needs approval.

2 min

Nashville's Music City Loop: two machines digging, a third about to start, first segment due late 2026

The Boring Company's Nashville tunnel is speeding up. Where the Loop should go, how far along it is, and how it links to Tesla.

2 min

The Boring Company wants to move freight through its tunnels, using trucks built from Tesla parts

A converted tunnel truck with Tesla Model 3 batteries and motors now carries a standard shipping container. What The Boring Company showed, what it did not say, and why it matters.

3 min

The Vegas Loop: how The Boring Company moves people through tunnels in Teslas

Under Las Vegas, Tesla cars shuttle passengers through tunnels between hotels, the convention center and toward the airport. Here is how the Loop works, what a ride costs and where it is going next.

3 min

Musk wants a 200 mph 'precursor Hyperloop' tunnel from Austin to San Antonio: what is actually known

Elon Musk says The Boring Company is working on a tunnel linking Austin and San Antonio, with trips of under 30 minutes. There is no route, budget or permit yet. Here is what was said, and the Tesla link.

3 min

Clark County approves 19 more Vegas Loop stations, taking the Tesla tunnel network to 123

The Boring Company now has county approval for 123 Vegas Loop stations, including new stops at F1's Grand Prix Plaza, on Tropicana Avenue and in Chinatown. About 11 are open today.

3 min

Vegas Loop carries 82,000 riders in Teslas during CONEXPO, as Prufrock-2 finishes a record 2.28-mile tunnel

The Boring Company's Las Vegas tunnels moved about 82,000 passengers during the five-day CONEXPO-CON/AGG trade show, and its Prufrock-2 machine completed the longest single Vegas Loop tunnel so far.